If in the previous session, the Build to Rent has been analyzed from the beginning of the process through the design of the architectural project, in this session it is analyzed from the point of view of the construction phase. If the architectural project must be different, will not its construction process also be? Build to Rent also involves collaborative processes to introduce those «industrialists» of their construction and do it as soon as possible so that they already support the same project design.