Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6114
PASSIVHAUS BUILDING PLATFORM | Good ventilation practice guides in buildings. Blower door, double flow mechanical ventilation and airtightness - REBUILD
24-26 MARCH 2026 | IFEMA MADRID

PASSIVHAUS BUILDING PLATFORM | Good ventilation practice guides in buildings. Blower door, double flow mechanical ventilation and airtightness

Wed 23 Apr | 13:00 - 13:15

The association’s working group with the best experts and companies in each topic has edited 3 good practice guides on different principles of the Passivhaus standard. Specifically, best practices for implementing dual-flow mechanical ventilation systems, airtightness, and the Blower Door test.

Speaker
Daniel Sánchez Peinado

Daniel Sánchez Peinado

Technical Director

Plataforma de Edificación Passivhaus