Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6114
Is BIM already used on site, and what is missing? - REBUILD
24-26 MARCH 2026 | IFEMA MADRID

Is BIM already used on site, and what is missing?

Thu 24 Apr | 12:00 - 12:30

Proposals to promote the use of BIM in construction.

Speakers
Jaume Masip

Jaume Masip

BIM Manager

011h